Project Cargo Insurance for High-Value Equipment: Which Cover and How to Buy
High-value project cargo insurance should be bought on ICC (A) terms, from the seller's factory to the project site; equipment tied to a commissioning date should also carry Delay in Start-Up (DSU) cover. The reason: carriers only pay compensation up to a liability limit, far below the value of the equipment.

Table of contents:
I. Why does high-value project cargo need its own insurance?
Because the carrier's liability is limited, while the value of project equipment is not.
Under Article 152 of the Vietnam Maritime Code 2015, unless the cargo value is declared before loading and stated in the bill of lading, the sea carrier pays at most 666.67 SDR per package or 2 SDR per kg of gross weight, whichever is higher. The unit of account is the Special Drawing Right (SDR) defined by the International Monetary Fund, also set out in Article 152.
Illustrative example: if a 42-tonne package is totally lost, the carrier pays at most about 84,000 SDR (2 SDR × 42,000 kg), usually far below the value of a turbine or transformer, not counting cases where the carrier is exempt from liability.
Note: standard cargo clauses all exclude loss caused by insufficient or unsuitable packing. So proper wooden crating and correct lashing are also conditions for a successful claim.

II. ICC (A), (B) or (C): which cargo clause to choose?
For high-value project cargo, choose ICC (A). The Institute Cargo Clauses (ICC) come in 3 levels:
ICC (A): covers all risks of physical loss or damage, except listed exclusions.
ICC (B) and ICC (C): cover only the named perils. ICC (C) is the narrowest.
Risk | ICC (A) | ICC (B) | ICC (C) |
Fire, explosion; vessel stranded, grounded, sunk or capsized; collision | Yes | Yes | Yes |
Overturning or derailment of land conveyance | Yes | Yes | Yes |
Jettison, general average | Yes | Yes | Yes |
Washing overboard | Yes | Yes | No |
Entry of sea, lake or river water into vessel or container | Yes | Yes | No |
Total loss of a package dropped during loading or unloading | Yes | Yes | No |
Theft and other physical loss not excluded | Yes | No | No |
Two common risks for project cargo are a package dropped during lifting and water entering deck cargo. ICC (C) covers neither.
All three clauses exclude delay, unsuitable packing and inherent vice. War and strikes risks require separate clauses.
Related articles:
- Heavy cargo route survey in Vietnam: when is it required?
- Vietnam road permits for oversize and overweight vehicles: documents, issuing authority, validityIII. How is project cargo insurance different from standard cargo insurance?
Project cargo insurance is designed for the whole project across many shipments and legs, focused on critical items. Some insurers in Vietnam, such as Chubb Vietnam, offer a dedicated product for this cargo.
Difference | Standard cargo insurance | Project cargo insurance |
Scope | Per shipment, per leg | The whole project, from the seller's factory through ports and barge transhipment to site |
Critical items | No distinction | Identified separately: high-value, oversize, overweight, special-handling cargo |
Survey | Usually only after a loss | A survey warranty may require an insurer-approved surveyor to approve transport steps |
Delay in Start-Up (DSU) | Not available | Can be added |
Critical items are equipment that, if lost or damaged in transit, could not be repaired, remanufactured, replaced or installed before the project's planned start-up date. Examples: generators, turbines, transformers, ship-to-shore cranes, reactors (Chubb, Project Cargo DSU).
DSU (Delay in Start-Up) covers lost revenue or profit when a critical item arrives late because of a loss covered by the cargo policy. DSU is not triggered by a vessel delay alone: there must be an indemnifiable physical loss first. That is why DSU is usually bought together with cargo insurance.
An example of scale: H-Cargo moved 1,250-tonne crawler cranes for a wind power project, nearly 1,790 tonnes of cargo, from Changshu (China) to Tan Thuan port. In a shipment like this, one damaged package can delay the entire project.

IV. Who buys the insurance: seller or buyer?
Under Incoterms 2020, only CIF and CIP require the seller to buy insurance, but the minimum cover differs between them (ICC Academy).
Term | Who buys | Minimum cover |
CIF | Seller | ICC (C), insured amount at least 110% of the invoice value |
CIP | Seller | ICC (A), insured amount at least 110% of the invoice value |
EXW, FCA, FOB, CFR… | Not mandatory for either party | The party bearing the risk decides |
A common trap when importing equipment on CIF terms: the seller buys only the minimum ICC (C), up to the destination port. The buyer assumes it is enough, but is not covered for a package dropped during discharge or for the leg from port to site.
Two ways to handle it:
State clearly in the sales contract that the seller must buy ICC (A), extended to the project site.
Or buy on FOB/FCA terms and arrange the insurance yourself.
V. How to buy project cargo insurance
The process has 5 steps and must be completed before cargo leaves the seller's warehouse.
Step | What to do | Notes |
1. Prepare information | Package list; dimensions, weight, centre of gravity, lifting points; value; schedule; handling and lashing plan | Insurers set premium and terms based on this information |
2. Choose the clauses | ICC (A); add war and strikes clauses; consider DSU for critical items | Ask clearly which terms apply to deck cargo |
3. Set the insured amount | At least 110% of invoice value under CIF/CIP | Underinsurance may mean the claim is not paid in full |
4. Fix the scope | From the seller's warehouse to site, including barge transhipment and intermediate storage | The inland leg is often missed |
5. Meet survey conditions | Appoint surveyors as the policy requires for lifting, loading and discharge | Skipping a mandatory survey may affect the right to claim |
The stowage method directly affects the insured risk; see the comparison in break bulk, flat rack or open top.
Need a transport plan detailed enough to work with your insurer? Call H-Cargo: +84 888 909 186. Our project team handles handling and lashing plans and import customs clearance for out-of-gauge equipment.
VI. What to do after a loss to get compensated
Notify the insurer immediately, keep the damage as found and call a surveyor before repairing or handling the cargo. The usual sequence:
Notify the insurer (or the claims agent named on the policy) as soon as the loss is found.
Record the damage with the port or carrier and take photos; send written notice of loss to the carrier.
Do not repair or discard cargo before the surveyor inspects it.
Collect the claim documents: policy, invoice, packing list, bill of lading, survey report, damage report with the port or carrier, claim letter.
Deadlines under the Vietnam Maritime Code 2015: if the damage is not apparent, written notice must reach the carrier within 03 days of receiving the cargo (Article 174); the time limit to sue the carrier is 01 year from delivery or the date cargo should have been delivered (Article 169). The policy may set its own notice deadline, so read it carefully when you receive it.
VII. FAQs
Is cargo insurance mandatory for imports and exports?
Not for every shipment. Under Incoterms 2020, the seller must buy it when the contract uses CIF or CIP; under other terms, the party bearing the risk decides.
Does ICC (A) cover losses caused by late delivery?
No. ICC (A), (B) and (C) all exclude delay. Losses from late equipment are only covered through DSU, and DSU only applies when the delay results from an insured loss.
If I import on CIF terms, do I need extra insurance?
Check first: CIF only requires ICC (C) to the destination port. For project cargo, ask for ICC (A) extended to the project site.
What is the minimum insured amount?
Under Incoterms 2020, for CIF and CIP it is 110% of the invoice value, in the contract currency.
VIII. Conclusion: 3 things to lock in before cargo leaves the factory
Clauses: ICC (A), plus war and strikes clauses; DSU for critical items if the project has a commissioning date.
Scope: from the seller's warehouse to site. If importing on CIF, check the seller's policy again.
Attached conditions: packing, lashing and surveys exactly as the policy requires.
Insurance bought after cargo has already had an incident is of no use.
Author: Navy Ngo - Project team
Contact us for a free consultation:
H-Cargo International Logistics
113-115 Ung Van Khiem St., Ward Thanh My Tay, Ho Chi Minh City
Tel: +84 888 909 186
Email: project@hcargovn.com
Web: www.hcargovn.com
Sources cited in this article: Vietnam Maritime Code 95/2015/QH13 (Articles 152, 169, 174); Incoterms® 2020 (ICC); Institute Cargo Clauses (A), (B), (C) 2009; Chubb Project Cargo/DSU product documents; H-Cargo project page "1250-ton-crawler-cranes". Accessed 10/11/2026. The 42-tonne example is an illustrative calculation, not an actual claim figure.