Vietnam Oversize and Overweight Cargo Regulations: 6 Key Changes for Transport Companies

Writer: Navy Ngo
Navy Ngo
1 hour ago
6 min read

The latest Vietnam regulation on oversize and overweight cargo transport is Circular 12/2025/TT-BXD, amended by Circular 19/2026/TT-BXD (effective 01/07/2026). Compared with Circular 46/2015 there are 6 major changes: the issuing authority, the 48-tonne threshold, overloading, survey thresholds, application documents and permit validity.

H-Cargo tractor fleet on an oversize and overweight cargo project in Vietnam
H-Cargo's tractor fleet on an oversize and overweight cargo project under the new regulations

Table of contents:


I. Which regulations govern oversize and overweight cargo transport?

The regulation in force is Circular 12/2025/TT-BXD of the Ministry of Construction, amended by Circular 19/2026/TT-BXD, consolidated in Consolidated Document 26/VBHN-BXD dated 02/06/2026.


Period

Regulation

Notes

Until 31/12/2024

Circular 46/2015/TT-BGTVT

Issued by the Ministry of Transport; no longer in force

01/01/2025 – 30/06/2025

Circular 39/2024/TT-BGTVT

Replaced Circular 46/2015 when the 2024 Road Law took effect

From 01/07/2025

Circular 12/2025/TT-BXD

Issued by the Ministry of Construction after the ministry merger

From 01/07/2026

Circular 19/2026/TT-BXD

Amends several articles of Circular 12/2025



II. Change 1: Who issues road permits?

Since 01/07/2025, road permits for oversize and overweight vehicles are issued by the provincial Department of Construction and are valid nationwide (Article 24).


  • Before: the Vietnam Road Administration, regional road management units and provincial Departments of Transport all issued permits.

  • Now: the Road Administration and regional units no longer issue permits; the Department of Construction replaces the Department of Transport (guidance letter from the Vietnam Road Administration, 08/2025).

  • What companies should do: apply at the Department of Construction where the business is registered, or where the vehicle and cargo start or end their trip.

Related articles:
- Vietnam road permits for oversize and overweight vehicles: documents, issuing authority, validity
- Bridge girder and steel structure transport: vehicles, lashing and process

III. Change 2: How is super-heavy cargo defined now?

Super-heavy cargo is no longer defined by the weight of the package, but by the total weight of the vehicle or vehicle combination including cargo exceeding 48 tonnes (Article 10.2).



Threshold in old documents

Circular 12/2025 (current)

Super-heavy cargo

Indivisible cargo weighing over 32 tonnes

Indivisible cargo that makes the total weight of the combination exceed 48 tonnes when loaded

Oversize cargo

Longer than 20 m, wider than 2.5 m, higher than 4.2 m (container vehicles: 4.35 m)

Same thresholds, measured on the overall dimensions of the vehicle including cargo


Illustrative example: a 30-tonne package on a tractor-trailer combination weighing 20 tonnes. Under the old method, the package was not super-heavy. Under the current rule, the total of 50 tonnes exceeds 48 tonnes, so a road permit is required.

1,250-tonne crawler crane transported on multi-axle trailers by H-Cargo
A 1,250-tonne crawler crane transported on multi-axle trailers as part of an H-Cargo project shipment

What companies should do: calculate the load on the actual combination that will run, including dunnage and lashing (Article 3.1), rather than the package weight as before.



IV. Change 3: Is "10–20% overload" still allowed?

No. Vehicles may not carry more than the cargo weight in their inspection certificate (Article 8.2.d), and permits are not issued for such cases (Article 22.3).


  • Old interpretation: many documents said "10% overload allowed, later 20%". In fact these were enforcement tolerances in old decrees, not a right to overload.

  • Now: two violations are separated: exceeding the vehicle's rated payload (per its inspection certificate) and exceeding the permitted load of the road or bridge. Current penalties are set by Decree 168/2024/NĐ-CP.

  • What companies should do: remove any "plus 10–20%" calculation from quotes and vehicle plans.


Need to check whether your cargo is oversize or overweight? Send the dimensions, weight and pickup and delivery locations to the H-Cargo project team: +84 888 909 186. H-Cargo handles import customs clearance, route surveys and inland transport as a single point of contact.


V. Change 4: When is a route survey required?

Route surveys are now based on height and width thresholds by road class, plus axle load limits, total weight and published restricted locations. The table below is from Appendix 06 of Circular 19/2026, which replaces Appendix XVI from 01/07/2026.


Road class

Maximum height without survey

Maximum width without survey

Expressway

4.75 m

3.0 m

Expressway (phased investment)

4.75 m

2.8 m

Class I, II, III (plains)

4.50 m

3.0 m

Class III (mountainous)

4.50 m

2.8 m

Class IV (plains)

4.35 m

2.8 m

Other classes

4.35 m

2.5 m


  • Old interpretation: many documents used a single width threshold such as 3.5 m or 3.75 m for every route.

  • Now: the same 2.9 m-wide vehicle (other parameters within limits) needs no survey on an expressway, but does need one on a Class IV plains road.

  • What companies should do: check each route section, especially the final stretch into the plant, where the road class is usually lowest.



VI. Change 5: What changed in the permit application?

Applications for Vietnamese-plated vehicles are reduced to the application form, plus a survey or strengthening report if the route requires one (Article 23.1).


  • Before: applications included copies of the vehicle registration, inspection certificate and transport plan.

  • Now: copies of registration and inspection certificates are only required for foreign-plated vehicles (Article 23.2). Applications are filed via the National Public Service Portal, by post or in person; the Department issues the permit within 02 working days of a complete application; results are issued electronically (Article 6, Circular 19/2026).

  • Coming soon: from 01/01/2027, permits will carry a QR code (Circular 19/2026/TT-BXD).


Details of each application document and the conditions written on the permit are covered in Vietnam road permit for oversize and overweight vehicles.



VII. Change 6: How long is a road permit valid?

A road permit is valid for up to 90 days when the route has been upgraded consistently and no mandatory conditions apply; 30 days if escort vehicles, a dedicated lane or strengthening are required (Article 22.4).

Crawler crane components on multi-axle trailers ready for site delivery
Components of a 1,250-tonne crawler crane on multi-axle trailers moved by H-Cargo, ready to go to site
  • New from 01/07/2026: besides the limit set by the vehicle inspection expiry, the permit validity may not exceed the validity of the route survey report (Article 5, Circular 19/2026).

  • Reusable survey reports: 06 months for vehicles with equal or smaller parameters; 09 months if the route is an expressway or a Class I, II, III plains road and the vehicle is no wider than 3.3 m (Articles 23.5, 23.6).

  • What companies should do: projects with several deliveries of similar size should reuse existing survey reports and choose vehicles whose inspection covers the whole delivery period.


Permits issued before 01/07/2026 remain valid until the expiry date written on them (Circular 19/2026/TT-BXD).



VIII. What should transport companies review under the oversize and overweight cargo regulations?

Review 5 places where old rules often remain:


  1. Internal training materials for sales, dispatch and drivers.

  2. Quote and transport contract templates that still cite Circular 46/2015 or the 32-tonne threshold.

  3. Load calculation: switch to the total weight of the combination.

  4. Planned vehicle list: inspection expiry against the project schedule.

  5. Route plans: check the road-class threshold table instead of a single limit.


For a 42-tonne equipment shipment measuring 8.6 × 3.7 × 4 m from Qingdao to VSIP II, the 3.7 m width exceeded the threshold of every road class in the table above. H-Cargo destuffed the cargo from the container to lower the height and surveyed the whole route on site before the move (project details).



IX. FAQs

Is Circular 46/2015/TT-BGTVT still in force?

No. Circular 46/2015 was replaced from 01/01/2025. The current regulation is Circular 12/2025/TT-BXD, amended by Circular 19/2026/TT-BXD.


Is a 40-tonne package super-heavy cargo?

Yes, in most cases. A 40-tonne package plus the tractor and trailer almost certainly exceeds 48 tonnes total weight, so the vehicle needs a road permit.


Are road permits issued before 01/07/2026 still valid?

Yes. Issued permits remain valid for the period written on them; survey reports prepared before then can also continue to be used (Circular 19/2026/TT-BXD).


X. Conclusion

The three changes with the biggest impact on cost and schedule are the 48-tonne threshold on the whole combination, survey thresholds by road class and permit validity tied to the survey report. Companies should update their documents and quotes before the next shipment.


An overview of vehicles and handling is in our article on oversize and overweight cargo transport; the steps of a shipment are in the 6-step project cargo transport process. For cargo longer than 20 m, see the length thresholds in extendable trailers for long cargo.


Author: Navy Ngo - Project team


Contact us for a free consultation:

H-Cargo International Logistics


Sources cited in this article: Circular 12/2025/TT-BXD (amended by Circular 19/2026/TT-BXD), Consolidated Document 26/VBHN-BXD: Articles 3, 8, 10, 22, 23, 24, Appendix 06; Circular 19/2026/TT-BXD Articles 5, 6; Circular 46/2015/TT-BGTVT (no longer in force); road permit guidance letter of the Vietnam Road Administration (08/2025); H-Cargo project page "handling-oog-shipment". Accessed 10/11/2026. The 30-tonne package example is an illustrative calculation. Check that regulations are still in force at the time of application.